Archigraphic.com
Menu
  • Profile
    • Curriculum Vitae
    • Software
    • References
  • BIM Technology
  • Development
    • Conferences
      • ANZAScA Conference
        • 44th ANZAScA Conference
      • Association of German Engineers
        • Association of German Engineers 2013
      • Australia Build Week
        • Australia Build Week 2021
        • Australia Build Week 2020
      • Autodesk BIM Conference
        • 06th Autodesk BIM Conference 2011
      • Autodesk University Australia
        • 04th AU Australia 2017
        • 03rd AU Australia 2016
      • Autodesk University Germany
        • 04th AU Germany 2015
        • 01st AU Germany 2012
      • Autodesk University UK
        • 01st AU UK 2017
      • Autodesk University USA
        • 29th AU USA 2021
        • 27th AU USA 2019
        • 26th AU USA 2018
        • 24th AU USA 2016
        • 19th AU USA 2011
      • BiLT ANZ by DBEI
        • 05th BiLT ANZ 2022
        • 04th BiLT ANZ 2021
        • 03rd BiLT ANZ 2019
        • 02nd BiLT ANZ 2018
        • 01st BiLT ANZ 2017
        • 12th RTC Australasia 2016
      • BiLT Europe by DBEI
        • 02nd RTC Europe 2014
      • BIM Coordinators Summit
        • BIM Coordinators Summit 2023
        • BIM Coordinators Summit 2022
      • BuildingSMART
        • bSA BIM User Forum 2014
        • bSA International BIM User Forum 2013
        • bSA BIM User Forum 2013
      • Digital Engineering Summit
        • Digital Engineering Summit 2019
      • Hospital Engineering Trends
        • 07th Convention Frankfurt 2017
        • 02nd Hospital Engineering Trends 2015
        • 04th Convention Frankfurt 2014
        • 03rd Convention Frankfurt 2013
      • Newforma Digital Summit
        • Newforma Digital Summit 2019
      • Smart Buildings Australia
        • 02nd Smart Buildings Summit 2017
      • Sydney Build Expo
        • Sydney Build 2020
        • Sydney Build 2019
        • Sydney Build 2018
    • Publications
      • Is Australia ready for the BIM mandate?
      • UNIFI Design Success Story
      • BIM in Australia and Germany
      • Indoor Air Quality and Health
      • Solar Energy – Power for a New Age
      • Conservation is not Enough
      • The Eco-House, Wellington
      • The 4th Dimension of Modelling
      • When Less Powers More
    • Workshops
      • LHW Workshop
      • Zero.Plus Workshop
      • PECS Workshop
    • Seminars
      • Dynamo Basic Training
      • White Card – Workplace Health and Safety
      • Navisworks Manage – The Complete Guide
      • Revit Architecture – The Complete Guide
      • Navisworks Manage Basic Training
      • Rhinoceros Basic Training
      • Revit Architecture Family Training
      • Revit Architecture Individual Training
      • Revit Architecture Basic Training
      • Project Management Seminar
      • Work Safety and Health Protection
    • User Groups
      • BIM Cluster Stuttgart
      • EmAGN Forum: BIM
      • Friday Forum
      • MelBIM
      • SYDBIM
      • Sydney Computational Design Group
      • Sydney dRofus User Group
      • Sydney Revit User Group
      • Revit User Forum
  • Projects
    • Architecture
      • Two New Education Buildings
      • Extension of an Office and Laboratory Building
      • New Laboratory Building
      • New Medical Clinic in Darmstadt
      • New Medical Centre Building
      • Reorganisation and Reconstruction of a Dermatology
      • New Apartment Building
      • New Residentail Building
      • Modelling a Staircase
      • New Office Building
      • New Apartment Blocks
    • Exhibitions
      • Open Day
      • Day of Construction and Architecture
      • [arc/sec] Exhibition
    • Web Design
      • Archigraphic
      • PG-Bau
      • Holiday House Dat Huuske
  • Blog
  • Contact
  • DE

Extension of an Office and Laboratory Building

Construction Office and Laboratory Building
Position | Phase Projekt Architekt | Wettbewerb
Service Period | Costs 2014 | 6.5 Mio. €
Architectural Firm Stuttgarter Service- und Planungsgesellschaft mbH | Stuttgart | Germany


The competition is asking for an overall offer on a turn-key basis. That includes the traditional scope of service in compliance with the HOAI (Oder of Fees for Architects and Engineers) and additional services such as surveys as well as the overall building costs. The new building is centrally located and connected directly to the existing office and laboratory building providing access regardless of weather conditions. The design contains additonal office and laboratory areas as stated within the space allocation plan. The building structure itself includes three levels and a technical area on the roof top. Due to economical and sustainable design influence the new building is designed to be expandable if needed. An option would be placing an additional structure to the south in order to continue the new structure which will also be directly connected to the new building.



· Imprint ·